最新的GAQM Certified Lean Six Sigma Yellow Belt (CLSSYB) - CLSSYB-001免費考試真題

One of the primary objectives of constructing an X-Y Diagram is to separate the vital few Y's from the trivial many Y's.

正確答案: A
Y, the output of a process, is the ______________ variable while Xn, the various inputs to a process, are the _____________ variables.

正確答案: C
Lean Principles defines for us seven specific areas where ________ typically exists in our processes.

正確答案: B
The length of wooden beams being sawed is measured by a line operator. Which is least likely to be influenced by the instrument?

正確答案: C
At the start of a project we are told to "walk the process" from beginning to the end. We do this to_____________________.

正確答案: C
Six Sigma refers to a process whose output has 100% of its data points within 8 Standard Deviations from the Mean.

正確答案: B
An important factor in a viable _________ is to determine who, when and to what level various personnel must be trained to maintain the improvements made to a process.

正確答案: C
Al bought a handheld GPS from his local electronics store. When he entered an address it would not function. For the manufacturer of the GPS this would be categorized as what type of cost?

正確答案: C
A 5 Why Analysis is used to help identify possible defect causes when which one of the below listed tools is created?

正確答案: C
A Monitoring Plan put into place at the conclusion of a project will provide for adequate systems with key metric readouts indicating out-of-spec conditions.

正確答案: B