最新的VMware Advanced Design NSX-T Data Center 2.4 - 3V0-41.19免費考試真題
An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution. This information was gathered by the architect during the Discover Task of the Engagement Lifecycle:
* Open communication between different application tiers Is not allowed.
*The security team has a firewall communication matrix documented.
* The IT team are not trained for NSX-T but have strong experience with vSphere.
* Aggregate North-South throughput at any given time should be at least 10G.
* Business critical applications should have an SLA of 99.99%.
* All traffic should recover in the event of Host/Rack/ToR failure.
* Multiple environments exist: Production, Staging and Development.
* Hardware is 5 years old and new hardware is already purchased.
* TheDevelopment Team are heavy on API usage.
* VLANs are being shared between physical and virtual workloads.
* Customer thinks SAN storage has enough capacity to build the new infrastructure.
Which three requirements were documented by the architect? (Choose three.)
* Open communication between different application tiers Is not allowed.
*The security team has a firewall communication matrix documented.
* The IT team are not trained for NSX-T but have strong experience with vSphere.
* Aggregate North-South throughput at any given time should be at least 10G.
* Business critical applications should have an SLA of 99.99%.
* All traffic should recover in the event of Host/Rack/ToR failure.
* Multiple environments exist: Production, Staging and Development.
* Hardware is 5 years old and new hardware is already purchased.
* TheDevelopment Team are heavy on API usage.
* VLANs are being shared between physical and virtual workloads.
* Customer thinks SAN storage has enough capacity to build the new infrastructure.
Which three requirements were documented by the architect? (Choose three.)
正確答案: A,B,F
說明:(僅 Fast2test 成員可見)
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution.
This information was gathered during the Assessment Phase:
* NSX-Twill span across two sites for disaster recovery.
* Public Load Balancer VIP should be accessible from a secondary site.
* Distributed Firewall Policies should be available at a secondary site.
* Routing capabilities should be maintained after failure.
* NAT capabilities are required.
Which two should the architect include in their design? (Choose two.)
This information was gathered during the Assessment Phase:
* NSX-Twill span across two sites for disaster recovery.
* Public Load Balancer VIP should be accessible from a secondary site.
* Distributed Firewall Policies should be available at a secondary site.
* Routing capabilities should be maintained after failure.
* NAT capabilities are required.
Which two should the architect include in their design? (Choose two.)
正確答案: A,D
說明:(僅 Fast2test 成員可見)
Which type of design includes vendor models, host names, IP Addresses, port connections, logical unit number sizes, and number of CPUs?
正確答案: C
說明:(僅 Fast2test 成員可見)
An NSX-T architect is working with a customer who wants to improve performance andfuture-proof their workloads with a multi-site architecture. A current-state analysis captured this information:
* Latency between sites Is 160ms.
* Bandwidth is 2Gbps.
* The MTU is 1600.
What two VMware design recommendations should the architect recommend to the organization to achieve future-proofing? (Choose two.)
* Latency between sites Is 160ms.
* Bandwidth is 2Gbps.
* The MTU is 1600.
What two VMware design recommendations should the architect recommend to the organization to achieve future-proofing? (Choose two.)
正確答案: B,C
說明:(僅 Fast2test 成員可見)
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution.
This information was gathered during the Assessment Phase:
* There Isn't much budget available for a newoff-shore site.
* The new site is decentralized and no communication with the main data center is required.
* The design will need to cater for availability, upgrades, and failure scenarios.
Which three should the architect recommend In their design? (Choose three.)
This information was gathered during the Assessment Phase:
* There Isn't much budget available for a newoff-shore site.
* The new site is decentralized and no communication with the main data center is required.
* The design will need to cater for availability, upgrades, and failure scenarios.
Which three should the architect recommend In their design? (Choose three.)
正確答案: A,B,D