最新的Veritas Administration of Veritas Cluster Server 6.1 for UNIX - VCS-254免費考試真題
How would you determine the minimum RAM required to run a VCS cluster?
正確答案: B
The amount of information logged on all Process resources needs to be increased in order to debug a problem in a VCS cluster. After running the proper commands to accomplish this, which file is modified?
正確答案: C
An administrator has removed a system from a running Veritas Cluster Server cluster so that the cluster now only has seven nodes. The administrator must ensure the cluster will start successfully after a complete cluster shutdown.
Which line should be in the /etc/gabtab file to successfully start the cluster?
Which line should be in the /etc/gabtab file to successfully start the cluster?
正確答案: D
Which Veritas Cluster Server command is used to override static resource type attribute values for a specific resource?
正確答案: B
Which two options can be used to install Veritas Cluster Server on remote systems using the provided install script? (Select two.)
正確答案: C,E
Which three does the Environment Check Utility (ECU) provide? (Select three.)
正確答案: A,B,E
What should be done before removing a resource named webdg from a running service group?
正確答案: B
What must you do to upgrade an application in a service group under VCS control? (Choose two.)
正確答案: A,D
While in Jeopardy, the system with the ONLINE GroupA service group crashes, Which GroupA attribute is set on the surviving systems?
正確答案: A
The log files used to verify that a custom application is being properly monitored are located in which directory?
正確答案: C
You are adding a system to a running cluster. You have successfully performed these steps on the system that you are adding:
1.Installed, configured, and tested all application resources required
2.Installed VCS
3.Configured and started VCS communications (LLT and GAB) What is the next step that you perform?
1.Installed, configured, and tested all application resources required
2.Installed VCS
3.Configured and started VCS communications (LLT and GAB) What is the next step that you perform?
正確答案: A
Refer to the following information:
OnlineTimeoutInterval = 60
OnlineRetryLimit = 2
MonitorInterval = 120
RestartLimit = 0
What will occur if an application takes 70 seconds to come online during the online process?
OnlineTimeoutInterval = 60
OnlineRetryLimit = 2
MonitorInterval = 120
RestartLimit = 0
What will occur if an application takes 70 seconds to come online during the online process?
正確答案: B
When making offline configuration changes, which command should be run to ensure the main.cf file has the correct syntax?
正確答案: D
During a failover, what attribute determines where the service group will go online?
正確答案: B