最新的SNIA Snia Storage Architect-Assessment,Planning and Design - S10-300免費考試真題
Company.com has a disk subsystem with eight ports. Each port delivers 200 MB/s. The customer Wants a solution designed which allows access from 32 servers with no single point of failure. Which number of HBAs and the associated throughput provide server access to the subsystem?
正確答案: A
When deploying a copy on write backup solution that uses 3rd party copy, which two statements Are true? (Choose two)
正確答案: A,C
An array is behaving erratically. Upon working and troubleshooting with the vendor representative, you are told that the only way to clear the problem is to reboot the unit. The vendor states they have seen this behavior previously and feels it will return the unit to a fully operational status. Which three actions should you perform? (choose three)
正確答案: A,B,D
Your SAN currently has eight server ports and eight disk ports on one 16 port switch. Each server port requires 80 MB/s of one-way bandwidth, spread out evenly among the storage devices. The customer would like to add 28 server ports along with 28 disk ports. Each server will evenly distribute its traffic on each disk. Using 16 port 1 Gb switches, which topology should you select to minimize the number of switches and ISLs required?
正確答案: B
The customer currently has 50 servers and 20 direct-attached storage array and wants to consolidate their data on a SAN. They want to be able to rapidly add storage and servers with minimum impact to data availability? Which topology is most appropriate?
正確答案: C
You have been asked to design a SAN/NAS that stores data that will be internally read by web browsers for data replay. Some browsers are more likely to render a readable version of a standards-based page, whereas some browsers will have problems rendering table-based data, invalidating your design. What should you implement in your design to mitigate these concerns?
正確答案: B
Which demonstrates a strong potential for data center error(s)?
正確答案: A
A company is designing a Disaster Recovery (DR) plan. They have an RPO of zero. The DR site is located 250km from the production site. The DR plan must not affect application performance at the production facility. Which scenario is appropriate?
正確答案: C
When planning a NAS solution, which two sub-processes are associated with NAS Service Capacity Management? (Choose two.)
正確答案: A,D