最新的NCARB ARE 5.0 Project Management (PjM) - Project-Management免費考試真題
An architect is performing a schematic design quality control review for a new mid-rise office tower.
Which drawings will be included in the architect's review?
Which drawings will be included in the architect's review?
正確答案: C
說明:(僅 Fast2test 成員可見)
According to ATA owner-architect agreements, who is responsible for the cost of evaluating significant substitutions proposed by the contractor, subcontractors, or suppliers and the cost of making subsequent revisions to drawings, specifications, and other documentation?
正確答案: D
說明:(僅 Fast2test 成員可見)
Which of the following is a primary responsibility of the architect during construction observation?
正確答案: C
說明:(僅 Fast2test 成員可見)

Refer to the exhibit.
Construction documents are 75% complete for a design-bid-build project. As part of an architecture firm's quality control plan, the senior architect reviews the drawings and specifications for coordination. Following the review, the project architect distributes the senior architect's markups to the consultants.
What should the mechanical engineer do next to maintain quality control?
正確答案: C
說明:(僅 Fast2test 成員可見)
An architect is working on a large renovation project with an AIA B101 contract. The owner decides to contract separately with an electrical engineer and a security firm. The security firm asks the engineer and architect to coordinate the details for a new card reader access control system.
What is the first step the architect should take?
What is the first step the architect should take?
正確答案: A
說明:(僅 Fast2test 成員可見)
An architect is evaluating a change order.
Where should the costs for the project superintendent or general foreman be included?
Where should the costs for the project superintendent or general foreman be included?
正確答案: C
說明:(僅 Fast2test 成員可見)
A key Project Manager leaves an architectural firm halfway through a project. Several days of lost productivity pass while the new Project Manager determines the customized organization that the previous Project Manager used. The new Project Manager recommends implementing new office policies to create standards and quality control methods for the entire office.
Which methods should be implemented? Check the four that apply.
Which methods should be implemented? Check the four that apply.
正確答案: A,C,E,F
說明:(僅 Fast2test 成員可見)
The main goals on a large project are ease of communication and commitment from the project team.
Which scheduling technique should be used?
Which scheduling technique should be used?
正確答案: C
說明:(僅 Fast2test 成員可見)