You have a 4-node FAS8040 cluster licensed for FCP and iSCSI. Each node has both FC and iSCSI LIFs. One of your
Windows 2012 Servers has a single 8Gb FC port and a single 10 Gb Ethernet port with switched connectivity to the FC
and Ethernet ports on the cluster. You need to use both ports on the host for multipath access to a LUN on the NetApp
cluster.
What will accomplish this task?

正確答案: B
When designing a new SAN solution, which three components should be verified with the IMT? (Choose three.)

正確答案: B,C,D
What is installed on your Linux host when you install the Linux Unified Host Utilities 7.0?

正確答案: D
說明:(僅 Fast2test 成員可見)
An administrator wants to provide isolation among physical devices connected to the same FCP fabric. Which Cisco
switch feature accomplishes this task?

正確答案: C
說明:(僅 Fast2test 成員可見)
A customer has recently deployed a clustered Data ONTAP 8.3 system and is trying to mount LUNs to a Windows 2012
Server using the iSCSI protocol. They have enabled jumbo frames on their nodes as well as their Windows 2012
Server. Whenever they attempt to scan for a new LUNs, Disk Management times out and does not present any new
storage.
What is causing the problem?

正確答案: B
On a Windows 2012 Server, the FC load balance policy is configured using which two utilities? (Choose two.)

正確答案: A,D
說明:(僅 Fast2test 成員可見)
You recently configured your SVM to serve data with the FC protocol by issuing the following commands:

However, your LIF still shows an operational status of down.
What must you do to change the operational status to up?

正確答案: D
說明:(僅 Fast2test 成員可見)
Which three environmental or physical requirements need to be met when designing a SAN solution? (Choose three.)

正確答案: C,D,E