最新的IASSC Certified Lean Six Sigma Green Belt - ICGB免費考試真題
A 1-Sample t-test is used to compare an expected population Mean to a target.
正確答案: B
The essence of Lean is to concentrate effort on removing waste while improving process flow to achieve speed and agility at lower cost.
正確答案: B
The reason(s) for not marking the customer Specification Limits (SL) on a Control Chart is which of these? (Note: There are 4 correct answers).
正確答案: A,B,C,E
Which of these are correct if Cpk Upper is 2.0 and Cpk Lower is 1.0?
正確答案: A
The deviation of the measured value from the actual value regardless of the operator is known as ______________.
正確答案: D
When looking at a distribution graph, the Mean is defined as the __________.
正確答案: D
A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.
正確答案: B
Which element of waste best describes "the unnecessary movement of materials and/or goods"?
正確答案: C
Hypothesis Testing can save time and help avoid high costs of experimental efforts by using existing data.
正確答案: B
The Z score is a measure of the distance in Standard Deviations of a sample data point from the Median of the sample population.
正確答案: A
A Belt will occasionally do a quick experiment referred to as an OFAT which stands for ____________________.
正確答案: C
The very best way to begin an effort to map a process is to do which of these?
正確答案: D
After reviewing the Capability Analysis shown here select the statement(s) that are untrue.
正確答案: A
Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are 3 correct answers).
正確答案: A,C,E