A customer is ready to order the HPE ConvergedSystem 500.
Which two tasks must be completed before preparing the Customer Intent Document (CID)? (Select two.)

正確答案: C,D
When designing a Converged Solution for VDI. for which critical VDI component should the architect
consider high availability?

正確答案: B
Which guideline should be followed when choosing the proper converged system for a CloudSystem deployment?

正確答案: A
For a Hyper-Converged VDI solution, a VLAN-based network design model will require separate VLANs
for which two functions? (Select two.)

正確答案: C,E