An architect is planning an HPE Moonshot System deployment. The architect plans to individually connect each management module to the management network. The customer then informs the architect that this plan requires too many 1GbE ports per rack for the data center infrastructure.
What should the architect do to meet the customer's needs, while still allowing iLO access to the HPE Apollo Systems?
What should the architect do to meet the customer's needs, while still allowing iLO access to the HPE Apollo Systems?
正確答案: A
View the Exhibit.

Refer to the exhibit. A customer has an HPE c7000 enclosure managed by HPE OneView with HP BL460c Gen9 servers in a vSphere cluster. The customer has multiple vLANs trunked from the top of rack (TOR) switches to the Virtual Connect modules in the enclosure. Due to network Access Control List (ACL) requirement and guidelines from the networking department, all network traffic should be forced to an upstream switch using the Virtual Connect "Private Network" feature.
The customer reports slow network response.
Which modification can the architect recommend to improve network performance?

Refer to the exhibit. A customer has an HPE c7000 enclosure managed by HPE OneView with HP BL460c Gen9 servers in a vSphere cluster. The customer has multiple vLANs trunked from the top of rack (TOR) switches to the Virtual Connect modules in the enclosure. Due to network Access Control List (ACL) requirement and guidelines from the networking department, all network traffic should be forced to an upstream switch using the Virtual Connect "Private Network" feature.
The customer reports slow network response.
Which modification can the architect recommend to improve network performance?
正確答案: D
Under which Transformation Area do HPE Moonshot solutions with Citrix fail?
正確答案: C
An architect proposes an HPE Moonshot server solution for a customer. The customer needs a single processor solution with a network switch to allow 10Gb connectivity and support for a software-defined network solution.
Which HPE Moonshot switch module meets the customer's needs?
Which HPE Moonshot switch module meets the customer's needs?
正確答案: C
An architect is designing a solution, a key element of which is the capability for fast VMware cluster growth with minimal administrative interaction.
Which HPE solution should the architect recommend?
Which HPE solution should the architect recommend?
正確答案: D
An architect needs to scope the number of required m710p cartridges for video transcoding. The architect plans to aim for an additional 20 to 25 percent growth capacity.
In addition to this growth capacity, which factors will determine the number of required cartridges? (Choose two.)
In addition to this growth capacity, which factors will determine the number of required cartridges? (Choose two.)
正確答案: A,B
An architect is planning an HPE Apollo 4530 solution to support the Cloudera distribution of Spark and HDFS.
Each HPE ProLiant XL450 in the solution uses the following baseline recommendations:
- 15 8TB HDDs (120TB total)
- 2 10-core 2.3GHz processors
- 128GB memory (64GB on each processor)
- 2-port 10GbE FlexibleLOM
The architect has planned enough servers to meet the customer's requirements for total capacity.
Which two components in this plan are most likely to cause a bottleneck as an increasing number of Spark applications run?
Each HPE ProLiant XL450 in the solution uses the following baseline recommendations:
- 15 8TB HDDs (120TB total)
- 2 10-core 2.3GHz processors
- 128GB memory (64GB on each processor)
- 2-port 10GbE FlexibleLOM
The architect has planned enough servers to meet the customer's requirements for total capacity.
Which two components in this plan are most likely to cause a bottleneck as an increasing number of Spark applications run?
正確答案: D
A customer needs high performance computing (HPC) and a small-scale solution with up to eight processors. The solution should also provide storage in a modular form factor. The customer's HPC application is designed so that some nodes act as compute nodes while others act as storage nodes that serve data to the compute nodes.
Which HPE Apollo system is most appropriate for this situation?
Which HPE Apollo system is most appropriate for this situation?
正確答案: A
說明:(僅 Fast2test 成員可見)
An architect reviews an HPE Apollo 6000 design and finds that there are plans for redundant iLO connections on each HPE Apollo 6000 chassis to a pair of top-of-rack switches. These switches are set up as individual switches connected to a single core.
Which configuration change should the architect recommend to ensure a loop free management topology?
Which configuration change should the architect recommend to ensure a loop free management topology?
正確答案: A
An architect finds several vulnerabilities with a customer's digital enterprise that could lead to data loss on a third-party storage system for critical business segments.
Which solution should the architect propose to help the customer to protect their digital enterprise?
Which solution should the architect propose to help the customer to protect their digital enterprise?
正確答案: A