最新的SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP6 - C_TSCM42_66免費考試真題
What do you have to consider regarding lot size procedures?
正確答案: B
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC.
On which specifications is the dynamic safety stock calculation based?
On which specifications is the dynamic safety stock calculation based?
正確答案: B
What are the consequences of setting a production order to Technically Complete (TECO)?(Choose three)
正確答案: B,C,E
Which property applies for consumption with planning strategy 40 (planning with final assembly)?
正確答案: C
Which types of objects can be changed with Engineering Change Management (ECM)?(Choose three)
正確答案: A,C,D
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.
How is the resulting firming interval specified in this scenario?
How is the resulting firming interval specified in this scenario?
正確答案: D
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?
正確答案: A
Which option for selecting a routing exists when you create a production order?
正確答案: C