Which of the following master data do you need to provide for process manufacturing?
(Choose three.)

正確答案: A,B,C
A supply chain planning run is to be carried out in the SAP ECC system as an example.
What would be the most effective sequence in which to run through the planning modules?

正確答案: A
Which of the following requirements for a manufacturing plant can be supported by using process manufacturing? (Choose three.)

正確答案: B,D,E
An enterprise based in the USA produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit kilogram (KG).
Which of the following solutions does SAP ECC offer?

正確答案: B
Which of the following possible errors would lead to the message shown? (Choose two.)

正確答案: B,D
Which of the following elements do you have to prepare for costing of a production order to function without errors? (Choose three.)

正確答案: B,C,E
What options for selecting a routing exist when creating a production order?
(Choose three.)

正確答案: A,B,D
What repetitive manufacturing options can you use to carry out line loading in the SAP ECC system and thus generate Run Schedule Quantities (RSQ) from normal planned orders?
(Choose three.)

正確答案: A,D,E