最新的SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - C_TS422_2020免費考試真題

What are the consequences if operation status Dispatched is set for a production order operation?

正確答案: A
Where do you maintain the duration of a product on operation?

正確答案: C
What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question.

正確答案: A,D
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question.

正確答案: A,B,C,E
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

正確答案: B,D,E
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

正確答案: B
During production order creation, several valid production versions are found. How does the system choose the product conversion?

正確答案: A
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.

正確答案: A,C