最新的Construction Specifications Institute Construction Documents Technologist - CDT免費考試真題
Who is responsible for accepting and inspecting for damage of the owner-furnished products delivered to the project site?
正確答案: B
說明:(僅 Fast2test 成員可見)
In what project stage does the architect/engineer obtain and document the owner's decisions about specific products and systems?
正確答案: A
說明:(僅 Fast2test 成員可見)
Which meeting is held for the purposes of introducing the design and construction teams, establishing the ground rules for communication, and explaining the administrative process?
正確答案: D
說明:(僅 Fast2test 成員可見)
Which of these is NOT a graphical format used to establish order and organization of construction drawings?
正確答案: A
說明:(僅 Fast2test 成員可見)
When the specifications allow controlled substitutions, a substitution may be approved during the bidding period only if what?
正確答案: B
說明:(僅 Fast2test 成員可見)
If the contractor discovers that a part of the contract documents is in violation of the building code, what should the contractor do?
正確答案: C
說明:(僅 Fast2test 成員可見)
What is MasterFormat keyword index used for?
正確答案: B
說明:(僅 Fast2test 成員可見)
What is the primary purpose of MasterFormat?
正確答案: C
說明:(僅 Fast2test 成員可見)
An architect/engineer wants to schedule monthly meetings with a contractor and owner to discuss matters pertinent to timely and successful completion of the work. Which type of meeting should they schedule?
正確答案: A
說明:(僅 Fast2test 成員可見)
Which of the following is NOT a method of specifying?
正確答案: C
說明:(僅 Fast2test 成員可見)