最新的IBM Power Systems with POWER8 Scale-out Technical Sales Skills V1 - C9010-251免費考試真題
Which of the following statements is true regarding CAPI?
正確答案: C
Which technology provides simple visualization for Ethernet with quality of service controls that specify minimum bandwidth per partition?
正確答案: C
Customer has multiple partitions running applications. Due to the user's different regions, each district will have a lot of memory requirements in the different times of day .
Which memory technology can be used to best achieve dynamic shared memory between logical partitions ?
Which memory technology can be used to best achieve dynamic shared memory between logical partitions ?
正確答案: B
A customer has a SAN team that wants to be able to easily map each LUN to a specific
World Wide Port Name (WWPN) on each client LPAR of a POWER8 server
Which technology should be implemented to satisfy the requirement?
World Wide Port Name (WWPN) on each client LPAR of a POWER8 server
Which technology should be implemented to satisfy the requirement?
正確答案: D
Which of the following Power Scale-Out operating systems includes integrated database and middleware components?
正確答案: B
A customer currently is running a POWER7 6-core 720 with 3 IBM i cores for production, and utilizing Power HA to a POWER6 2-core server as their backup machine.
The production machine also has unlimited users, IBM i Access users, SOL, and ILE
Compilers. They are only using the backup machine to do backups, but it is not a CBU; it has only one IBM i and one licensed Power HA core.
The customer wants the backup server to have the same capacity as the production server so it can be a true high availability server.
Which of the following is the correct course of action at the least cost?
The production machine also has unlimited users, IBM i Access users, SOL, and ILE
Compilers. They are only using the backup machine to do backups, but it is not a CBU; it has only one IBM i and one licensed Power HA core.
The customer wants the backup server to have the same capacity as the production server so it can be a true high availability server.
Which of the following is the correct course of action at the least cost?
正確答案: D
SAN team hopes customers will easily be able to map each LUN to a specific WWPN for each client logical partition on the Power8 server.
Which technology should be implemented to meet the requirements ?
Which technology should be implemented to meet the requirements ?
正確答案: D
Which power option is provided with the S822?
正確答案: C
A customer is ordering a 4-core S814 with the following partitions:
* An IBM i partition capped at 1.0 processors
* A second IBM i partition capped at 0.5 processors, running a Web Sphere application.
* An AIX partition capped at 0.5 processors.
* A Linux partition capped at 0.5 processors.
How many Web Sphere licenses are required to support this configuration?
* An IBM i partition capped at 1.0 processors
* A second IBM i partition capped at 0.5 processors, running a Web Sphere application.
* An AIX partition capped at 0.5 processors.
* A Linux partition capped at 0.5 processors.
How many Web Sphere licenses are required to support this configuration?
正確答案: B
A customer wants to consolidate AIX, Linux and IBM i workloads. They are also thinking about Analytic applications and a small-to-mid-size database.
Which of the following servers satisfies the customer's requirements?
Which of the following servers satisfies the customer's requirements?
正確答案: A
Which high-value function do Shared Storage Pools provide?
正確答案: C
Which technology provides simple virtualization for Ethernet, with quality of service controls that specify minimum bandwidth per partition?
正確答案: B
What does the numeral "4" represent in a model S824?
正確答案: A