最新的IBM PureFlex Technical Support V1 - C4120-781免費考試真題
A customer has a mix of several Power and x86 nodes. Virtual machine management is very important. What is the appropriate minimum PureFlex bundle that includes these functions?
正確答案: A
A customer has a legacy x86 deployment on physical servers. What benefit do server hypervisors such as VMware offer to preserve legacy workloads?
正確答案: C
A customer plans to have an IBM PureFlex System Standard with x240 and p260 nodes installed at a hosting facility where power usage is charged by consumption. 75% utilization is expected. Which of the following can be used to provide power consumption for the chassis for budgeting purposes?
正確答案: D
An existing IBM customer is evaluating PureFlex. They want to know their best option to manage.
Which of the following should be recommended?
Which of the following should be recommended?
正確答案: D
說明:(僅 Fast2test 成員可見)
What risk should be identified during a Pre-Sale TDA for the recovery of the FSM?
正確答案: B
Which of the following PureFlex competitors sell only x86 servers in their Integrated offering?
正確答案: D
A customer is interested in virtualizing their lightly used Power servers onto a PureFlex node. There are four active CPUs on their PureFlex POWER7 node, Which of the following is the maximum number of LPARs that can be started when they virtualize with PowerVM?
正確答案: D