最新的IBM Power Systems with POWER8 Scale-out Technical Sales Skills V1 - C4040-251免費考試真題
A customer wants to show workloads in real time, highlighting possible problems or bottlenecks.
What will satisfy the requirement?
What will satisfy the requirement?
正確答案: B
Which of the following Power Scale-Out operating systems includes integrated database and middleware components?
正確答案: B
A customer with IBM i and AIX platforms wants to take advantage of a recently acquired
XIV Storage System, TS3500 and POWERS system. They are planning to implement 10
LPARs and need to have access to the tape library for SAN backups. The customer also wants to minimize the downtime by VIO Server maintenance.
Which option will satisfy their requirements?
XIV Storage System, TS3500 and POWERS system. They are planning to implement 10
LPARs and need to have access to the tape library for SAN backups. The customer also wants to minimize the downtime by VIO Server maintenance.
Which option will satisfy their requirements?
正確答案: D
A client would like to user Power servers to reliably manage large volumes of structured and unstructured data using the Hadoop open source framework.
Which IBM offering will satisfy their requirement?
Which IBM offering will satisfy their requirement?
正確答案: D
說明:(僅 Fast2test 成員可見)
Customers want to have a mix of the S824 SSD and HDD, using the extended functions (18 disks) backplane (EJOP), and do not want to use the Easy Tier feature.
How to achieve ?
How to achieve ?
正確答案: B
Customers to migrate to the 6-core Power6 520 S814, Which backplane RAID 5 provides the best performance ?
正確答案: A
A customer is interested in migrating Little Endian (LE) Linux workloads to POWERS servers running Power KVM.
Which Linux distribution will satisfy the requirement?
Which Linux distribution will satisfy the requirement?
正確答案: C
A customer with data centers 1500 km (930 miles) apart wants to create a solution which enables role swaps for high availability
What is the MINIMAL PowerHA offering that will satisfy their requirement?
What is the MINIMAL PowerHA offering that will satisfy their requirement?
正確答案: D
A customer wants to use Live Partition Mobility to migrate from their POWER8 machine to their POWER7+ machine.
What is an important consideration when attempting the migration?
What is an important consideration when attempting the migration?
正確答案: D
Which of the following are required in order to utilize Live Partition Mobility?
正確答案: C
說明:(僅 Fast2test 成員可見)