最新的IBM DB2 9.7 DBA for Linux UNIX and Windows - C2090-541免費考試真題

Which method may be used to collect deadlock information in DB2 97?

正確答案: D
What are three authorization categories in DB2? (Choose three.)

正確答案: A,B,C
You have a job scheduled to run every Saturday; the scheduler is turned off on Friday and then restarted on Monday. The job scheduled for Saturday is now a job that is scheduled in the past. Which configuration parameters will allow your Saturday job to run when the scheduler is restarted?

正確答案: A
Due to an application error, some data was deleted from a very large table residing in table space TS1. The table space was then renamed TS2 before the error was detected. Rather than try and rebuild this table, it was decided that database DB1 would be restored and then rolled forward to a point-in-time (PIT) before the delete operation took place. Unfortunately the PiT roll forward was done to a time that was too early and some critical transactions were missing when the database was brought back on-line. Which steps must be taken to ensure that the critical transactions which are currently missing from the database are correctly applied to the database and that table space TS1 is renamed TS2?

正確答案: A
Which two can be replicated using HADR? (Choose two.)

正確答案: A,D
Which SQL statement will execute successfully?

正確答案: B

聯系我們

如果您有任何問題,請留下您的電子郵件地址,我們將在12小時內回复電子郵件給您。

我們的工作時間:( GMT 0:00-15:00 )
週一至週六

技術支持: 立即聯繫 

English 日本語 Deutsch 한국어