最新的IBM Power Systems Scale-Up Technical Sales - C1000-031免費考試真題

An IBM i customer has installed a Power System E980 with 32 installed and 20 active cores. They run VIOS on four cores and three IBM i LPARS in capped mode.
* LPAR A uses 8 cores.
* LPAR B uses 6 cores.
* LPAR C uses 2 cores.
The customer has a requirement to make LPARs A and B highly available and wants to use PowerHA for IBM i to achieve this.
What is the minimum number of cores that need to be licensed for PowerHA on the primary server?

正確答案: B
Which of the following is an advantage of Power System Servers over Oracle Exadata solutions?

正確答案: D
A customer needs to run a Linux database application that is supported on both x86 and Power System processors.
What is the advantage of selecting a POWER9 processor-based system for this application?

正確答案: C
Which component of PowerSC monitors AIX systems, maintains security, and provides alerts when a change to the system violates a configuration policy?

正確答案: A
Which of the following adapters is used to attach a FlashSystem 900 to a Power System E980?

正確答案: C
A customer is evaluating options for a new system to handle a rapidly growing workload. Initial requirements are for 16 cores and 1TB, and growth expected to be 15% per year.
Why should Enterprise Power Systems be marketed over Scale-out systems to this customer?

正確答案: B
An AIX customer is purchasing two new POWER9 processor-based servers: each connected to its own DS8880 at different sites. The customer wants high availability with the least amount of downtime.
Which solution will satisfy the customer's requirements?

正確答案: C
A customer wants to configure a Power System E950 with:
* 36 physical processor cores
* 24 active processor cores
* A partition running AIX with 8 virtual processors and 4.0 processor entitlement.
* A partition running AIX with 12 virtual processors and 7.2 processor entitlement.
* A partition running Linux with 8 virtual processors and 6.4 processor entitlement.
* 2 partitions running VIOS, each with 4 virtual processors and 2.0 processor entitlement.
* All partitions are uncapped.
* All processors are in the default pool. No additional Shared Processor Pools are used.
How many AIX licenses are required?

正確答案: B
Which of the following is true for systems virtualized with PowerVM?

正確答案: C
A customer has used Trial Capacity on Demand on their Power System E980 for two months to test the effect of activating two additional cores and 32GB of additional memory for their SAP LPAR. Being satisfied with the test result, they bought a permanent activation of the two cores and 32GB memory.
They now want to do another short test that requires the activation of one additional core.
Which option provides the most cost-effective solution?

正確答案: B

聯系我們

如果您有任何問題,請留下您的電子郵件地址,我們將在12小時內回复電子郵件給您。

我們的工作時間:( GMT 0:00-15:00 )
週一至週六

技術支持: 立即聯繫 

English 日本語 Deutsch 한국어