最新的SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP6 - C-TSCM42-66免費考試真題

In the SAP ECC system, a material is produced using production orders. The planning table for repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot).

What could be the reason?

正確答案: A
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling?(Choose three)

正確答案: A,B,E
Which of the following functions are available in SAP ECC when using capacity leveling?(Choose three)

正確答案: A,B,D
Which of the following requirements is supported by using process orders?

正確答案: D
Which of the following are characteristics of ECC master production scheduling (MPS)?(Choose three)

正確答案: B,C,E
Which of the following properties about the planning functions available in SAP ECC applies?

正確答案: D
You want to enhance the system statuses of a production order with user statuses.
How do you do this?

正確答案: A
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.
However, a corresponding rescheduling exception message does not appear.
What could be the reasons?(Choose two)

正確答案: C,D