A regional user group raised awareness about a third-party add-on tool that enables a team to establish thresholds for model warnings. In addition, it automates suppressing warnings deemed negligible to a specific project.
Which two data points should a BIM manager gather to build a business case to have the tool approved for use across the firm? (Select two.)

正確答案: A,D
說明:(僅 Fast2test 成員可見)
During early coordination on a hospital project, the BIM manager runs a general clash detection between all models and generates over 3,000 clash results. Many are low-priority issues, such as wall-grid overlaps and minor duct-ceiling intersections. The project's clash matrix outlines only high-impact clashes between structural, MEP, and architecture in specific zones.
For the BIM manager, what is the most appropriate next step to align clash reporting with the project's coordination strategy?

正確答案: D
說明:(僅 Fast2test 成員可見)
A client's project schedule requires a rigorous milestone/gateway review process, defined in the BIM Execution Plan. The design firm has its own internal checklist.
What should a BIM manager do to ensure the team is complying with the client's requirements?

正確答案: D
說明:(僅 Fast2test 成員可見)
Refer to the exhibits.


The firm's technical group would like to show demolished elements as dashed red in all future projects. The BIM manager is updating the Revit template to meet this new standard.
Which Phase Graphic Override will accomplish this?

正確答案: B
說明:(僅 Fast2test 成員可見)
The BIM manager oversees both design coordination and post-handover data requirements and is asked to ensure the digital deliverables align with the owner's long-term asset-management system.
To minimize information gaps, inconsistencies in file formats, and unclear responsibilities throughout delivery, which tool should the BIM manager rely on to define who provides what information, when, and in what format, from design through facilities handover?
Note: In the context of this exam, the term Level of Development (LOD) is used interchangeably with level of information need.

正確答案: D
說明:(僅 Fast2test 成員可見)
A Revit model in Autodesk Forma that does not have any consultant links is opening for all team members except one. The project BIM manager has already audited and compacted the model.
What should the BIM manager do so that the team member can open the model?

正確答案: A
說明:(僅 Fast2test 成員可見)