最新的Axis Network Video - AX0-100免費考試真題
An integrator receives a specification for surveillance cameras for a large project, where the requirements are impossible to live up to. Which of the key numbers below would have to change in order to find a camera to fill the demands?
正確答案: D
A camera lens with a low f-stop value of 1.2 will outperform a lens with a higher f-stop value due to which one of the parameters below?
正確答案: D
How can existing coaxial cable be leveraged when installing network cameras?
正確答案: D
If an installer wants to configure 20 cameras to show the same synchronized date and time in Live View, how can this be achieved?
正確答案: B
DRAG DROP
Match the protocol to its default port number. Drag each gray box from the left column to the matching blue box in the right column.

Match the protocol to its default port number. Drag each gray box from the left column to the matching blue box in the right column.

正確答案:

Explanation:
http://en.wikipedia.org/wiki/List_of_TCP_and_UDP_port_numbers
Which of the following conditions has to be met to use multicast streaming?
正確答案: D
The purpose of DHCP is to
正確答案: B
The capability to view and record up to four different areas of the whole image of an AXIS P1346 is called
正確答案: D