What two resources and techniques should be leveraged for successful project plan execution? (Select two.)
正確答案: A,E
A consultant is assigned a Proof of Concept (POC) showcasing Enterprise Vault File System Archiving in the customer's lab environment. Upon arrival the customer has changed the dynamics and states that production data will be included in the POC. What should the consultant do first?
正確答案: D
What information is required prior to starting an engagement when planning for an Enterprise Vault Assessment?
正確答案: B
What result will the following Discovery Accelerator search string produce? [All Of] Acme Corp takeover -coyote
正確答案: A
Refer to the exhibit.

How can the proposed design be improved to make DR Failover more streamlined?

How can the proposed design be improved to make DR Failover more streamlined?
正確答案: B
A customer has asked a consultant to recommend a way for marks to be created in Discovery Accelerator (DA) that will be available to the current active case but also be available for use in future cases as well. What option should the consultant recommend?
正確答案: B
Which two items does a consultant need to review on the internal planning call after the Statement of Work (SOW) has been signed? (Select two.)
正確答案: B,E
A consultant is preparing for an Enterprise Vault Upgrade with a customer. What two activities should the consultant perform prior to arriving onsite? (Select two.)
正確答案: C,D
What is a supported method of enhancing the scalability and performance of Discovery Accelerator (DA)?
正確答案: D
An administrator is onsite to advise on PST Migration options to the customer. However, many PST files are password protected. Which migration method is most suitable for their environment?
正確答案: A