最新的Blue Prism Accredited Developer - AD01免費考試真題

Consider the following flow within an Object Studio action:

The developer of this flow found that writing some credentials to the target application sometimes failed with an exception even though the element exists on the screen. He found that simply catching the exception, waiting for 2 seconds and then retrying fixed the problem.
What problems do you see within the flow? (select 2 responses)

正確答案: A,C
FILL BLANK
Review the Action flow below which loops through the Customer List Collection until the relevant customer match is found, and then uses the 'Set DOB' Calculation stage to copy the value from the Collection column 'DOB', to the DOB data item:


- The DOB data item is a Date data item with no initial value.
- The DOB column in the Customer List Collection is a Date data type.
What expression would you use in the 'Set DOB' Calculation stage, to copy the value from the Collection column, to the DOB data item?
(Remember, Blue Prism expressions are case sensitive)
正確答案:
[All Text] & [Coll.Field]
Study the following image showing pan: of the flow within a process:

What problems do you see with the process flow? (select 2 responses)

正確答案: C,D
When building a solution to use Tags within a Work Queue, which of the following statements is correct true?

正確答案: C
Please refer to the exhibit.

The Developer is automating an SAP Windows-based application within a Citrix environment. There is an issue with a duplicate match found when identifying and highlighting the Document No. field, due to the application window having two of the same labels and buttons.
Which Spy Mode should the Developer use to identify the correct field using Surface Automation?

正確答案: A
說明:(僅 Fast2test 成員可見)
Study the following Process flow:

The Process flow is intended to test the value of the Input data item to determine if it falls within a range of numbers, and then assign a value as an output. The number ranges are defined as between 1 to 100, between
101 to 200, and anything outside these ranges.
The Calculation stages will set the value of the Result data item to 1, 2 or 3.
To enable the Process flow to work correctly, what is the correct expression for the Choice stage branch named 'Between 1 and 100'?

正確答案: A
In which of these scenarios is it ok not to use a Blue Prism work queue as part of your Blue Prism solution?

正確答案: B
Please refer to the exhibits.


The Developer needs to ensure Blue Prism best practices are followed in respect to naming conventions and layout How would the Developer build an Object that Logs into the Application, and then Navigates the Orders page left-hand menu?

正確答案: C
說明:(僅 Fast2test 成員可見)
Examine the following Process flow:

The 'Loop Customer List' loop is configured to loop through the 'Customer List' Collection.
Any Exceptions Encountered on the 'Email Customers' sub-page will be resolved in the same page.
How many times will the 'Email Customer' sub-page be executed?

正確答案: C
The Work Queue 'Account Closure has a number of Pending Items which may be tagged as "Current",
"Saving" or "Loan" What is the correct configuration to get the next item from the queue that is tagged either
"Current" or "Loan"?

正確答案: C
The Developer has a Process designed to input new purchase orders The automation should open an Excel file of data validate that all fields are populated and that the purchase price is in the correct currency, before entering the order in the software application What best practice approach should the Developer take when testing the process'

正確答案: A
說明:(僅 Fast2test 成員可見)
The Developer is deploying a Process into a Production environment. Which best practice option would you recommend for the Stage Logging of a Decision stage on the Main Page?

正確答案: D
說明:(僅 Fast2test 成員可見)

聯系我們

如果您有任何問題,請留下您的電子郵件地址,我們將在12小時內回复電子郵件給您。

我們的工作時間:( GMT 0:00-15:00 )
週一至週六

技術支持: 立即聯繫 

English 日本語 Deutsch 한국어