最新的ATLASSIAN Managing Jira Cloud Projects - ACP-620免費考試真題
Your team wants to see the average number of days that resolved issues were open over a given period displayed in a chart.
Which gadget meets this requirement?
Which gadget meets this requirement?
正確答案: B
說明:(僅 Fast2test 成員可見)
You shared a URL to the dashboard with Bobby but when he looks at it, the gadgets return errors that state,
"The filter configured for this gadget could not be retrieved."
What is the most likely problem with the filters?
"The filter configured for this gadget could not be retrieved."
What is the most likely problem with the filters?
正確答案: D
說明:(僅 Fast2test 成員可見)
Vishnu is the Project Lead of the DEV project He can create new components inline while viewing DEV issues.
You should have the same ability as Vishnu. However, you can only select an existing component not create new ones inline.
Which change will definitely enable you to create new components inline?
You should have the same ability as Vishnu. However, you can only select an existing component not create new ones inline.
Which change will definitely enable you to create new components inline?
正確答案: A
說明:(僅 Fast2test 成員可見)
5 development teams need to work across 3 projects and plan their iterations in a single board.
Which board supports this?
Which board supports this?
正確答案: B
說明:(僅 Fast2test 成員可見)
You are the project administrator for a team based in the Middle East.
You need to change the Standard Working Days configuration on the board: from Sunday to Thursday instead of Monday to Friday.
What will be affected by this change?
You need to change the Standard Working Days configuration on the board: from Sunday to Thursday instead of Monday to Friday.
What will be affected by this change?
正確答案: B
說明:(僅 Fast2test 成員可見)
You are reviewing the Created vs. Resolved Issues Report for the last fourteen days in your project. The report is shown.

Created issues are represented by the top line, which is red and has dots for the data points on each day.
Resolved issues are represented by the bottom line, which is green and has dots for the data points on each day.
Which conclusion candefinitelybe drawn from the report?

Created issues are represented by the top line, which is red and has dots for the data points on each day.
Resolved issues are represented by the bottom line, which is green and has dots for the data points on each day.
Which conclusion candefinitelybe drawn from the report?
正確答案: A
說明:(僅 Fast2test 成員可見)