最新的IBM Assessment: IBM WebSphere Operational Decision Management V8.0, Application Development - A2180-400免費考試真題

Within a pricing application, there are three valid regions: A, B, and C.
The pricing rules currently include this decision table. The current version of this table has a gap in the rules and does not assign a discount for Gold customers in region C.
To prevent this rule from getting deployed in the future, gaps for this decision table should be treated as an error.

What should the application developer do in Rule Designer to treat gaps as an error condition within this decision table?

正確答案: A
An application developer is validating a rule project in Rule Designer and needs to create a new DVS Excel File Run Configuration. Instead of testing all of the rules, the new run configuration must also specify a subset of the rules to test. Which setting in the run configuration must the application developer apply?

正確答案: A
A business analyst requests that Decision Center users who belong to the: ?Manager group can create, update, view, and delete rule artifacts, but cannot update the status of rule artifacts. ?Validator group can view rule artifacts or change their status, but cannot create, update and delete them. How should the application developer set up the Decision Center permissions table to meet these requirements?

正確答案: D
Business users want to be notified when a RuleApp has been updated or deleted. What should the application developer do to support this requirement?

正確答案: B
A Rule Project was developed in Rule Designer and is ready to be tested. To facilitate troubleshooting of ruleset executions using sample data, the application developer needs to build a custom test harness that embeds a native rule engine and uses the IlrRuleset and IlrContext API. What type of project should the application developer create?

正確答案: C
An application developer collects the following requirements from the business analyst for the case assignment system:
-There are 4 sets of rules to be executed in successive tasks: initialization, preprocess, check
workload and assign case. -The initialization rules should be divided into 5 subsets and orchestrated with 1 ruleflow. -The assign case rules should be divided into 6 subsets and orchestrated with 1 ruleflow.
How should the application developer create the ruleflows?

正確答案: C

聯系我們

如果您有任何問題,請留下您的電子郵件地址,我們將在12小時內回复電子郵件給您。

我們的工作時間:( GMT 0:00-15:00 )
週一至週六

技術支持: 立即聯繫 

English 日本語 Deutsch 한국어