最新的IBM Assessment: IBM Sterling B2B Integrator V5.2, Solution Implementation - A2060-218免費考試真題

A company needs to call an executable program on a remote server. Which service or adapter can be configured to work with remote systems?

正確答案: B
When a file arrives it must be archived. The ProcessFileArrival and ArchiveFile Business Processes (BP) handle this.The requirement is for ProcessFileArrival to invoke ArchiveFile, but not wait for ArchiveFile to finish before further processing. Which invoke mode should be used?

正確答案: A
A developer has created and deployed a LWJDBC adapter with only result_name and
row_name defined. The developer has opened the configuration setting for this LWJDBC in the Graphic Process Modeler (GPM) and put this into the SQL parameter SELECT * FROM CERTTEST WHERE TEST = O? ?O? Which other parameters need to be configured?

正確答案: C
A developer has set up a File System Adapter tomonitor a specific folder on the file system.
When a file arrives in the folder, a Business Process (BP) will be executed. Where will the
file payload be available to the rest of the BP?

正確答案: C
A developer has created two FTP Client adapters 'FtpClient1' and 'FtpClient2' and placed them in the 'FtpClientGroup' Service Group. What is the proper way to invoke these adapters in a clusteredenvironment to allow for maximum availability?

正確答案: C
A developer usesa dynamic value in multiple Business Processes (BP) which can change between environments of IBM Sterling B2B Integrator (SBI) using sci-get-property. Which two methods could the developer use to reuse the same BP with different values in a different environment of SBI? (Choose two.)

正確答案: B,C
A new IBM Sterling B2B Integrator (SBI) system is being designed for a client. The client will use a mix of document storage types. To ensure the system stores alldata in encrypted format, which security parameter must be set for this deployment?

正確答案: C
A company has a new version of an activeBusiness Process (BP). They would like to add the new .bp version from the Graphical Process Modeler (GPM) to IBM Sterling B2B
Integrator (SBI) and have the new version run. Which steps need to be completed to use the new version?

正確答案: A
A customer properties file called test.properties has the following entries: ABCD = 1234 test = ABCD
What is the correct way to get the value of the ABCD property into process data VAR1?

正確答案: C
A customer has deployed a two node active-active IBM Sterling B2B Integrator (SBI) cluster in the secure zone on two servers. The customer has installed two servers in the DMZ for the purpose of installing remote SBI Perimeter Servers to facilitate communications with external partners. Each server in the DMZ is multi-homed (two external facing NIC cards with two external IP addresses and one internal facing NIC card) to two different external facing network segments for redundancy in case one network segment fails or a NIC card fails. External partners will connect to an external IP Load Balancer that will distribute inbound FTP/S, SFTP and HTTP Client sessions across the Perimeter Servers. The Perimeter Servers will be installed without using wildcard addresses. The customer requirement is that if any single server fails andoneServers. The Perimeter Servers will be installed without using wildcard addresses. The customer? requirement is that if any single server fails and one of the two external facing network segments fail, all the other SBI nodes and remote Perimeter Serverinstances must continue to actively handle inbound sessions for each protocol. What is the minimum number of remote Perimeter Server instances that must be deployed in the DMZ?

正確答案: A

聯系我們

如果您有任何問題,請留下您的電子郵件地址,我們將在12小時內回复電子郵件給您。

我們的工作時間:( GMT 0:00-15:00 )
週一至週六

技術支持: 立即聯繫 

English 日本語 Deutsch 한국어