最新的Microsoft Recertification for MCSD: Application Lifecycle Management - 70-499免費考試真題

Your network environment includes an on-premise Microsoft Visual Studio Team Foundation Server (TFS) 2012 server.
You create a work item custom query named Tasks Exceeding Original Estimate Hours in your My Queries folder.
You need to meet the following requirements:
- The query should be available to all team members.
- Aggregate results of the query, in the form of total number of work items that match the query, should appear as a tile on the Home page of the Team Web Access client.
What should you do?

正確答案: D
DRAG DROP
You have a Microsoft Visual Studio Team Foundation Server (TFS) 2010. A new server is installed with Windows Server 2012 R2 Standard.
You want to migrate TFS to the new hardware and upgrade it to TFS 2013. You install TFS 2013 on the new hardware.
You need to complete the migration and upgrade.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
正確答案:
Your development team is using the Microsoft Solution Framework (MSF) for Capability Maturity Model Integration (CMMI) Process Improvement 6.0 process template.
The team has identified all of the acceptance criteria for a new application. This data currently resides in a series of spreadsheets.
You need to enter the criteria into TFS for team traceability and tracking.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)

正確答案: B,C
Your network environment includes a Team Foundation Server (TFS) 2012 named TFS1 that contains two project collections named PC1 and PC2. A build server named Bi is configured with a build controller named C1 and an agent named A1 that runs build definitions created in Pd.
A development team wants to create a gated check-in build definition on PC2.
You need to perform a supported infrastructure enhancement to run PC2 build definitions.
What should you do?

正確答案: A
You are the administrator and lead developer of Microsoft Visual Studio Team Foundation Server (TFS) for Contoso, Ltd.
You identify a security issue in one of the company's projects that you support. You trace the issue to $/Contoso/src/ReadInput.cs, but that file is locked in workspace Projectl[;nicholaspiazza] by a user who is unavailable.
You need to unlock the file.
Which command should you execute?

正確答案: B
說明:(僅 Fast2test 成員可見)
You are configuring a Team Foundation Server (TFS) Agent, which will execute an application on a Windows 7 desktop computer.
You log on to the Windows 7 desktop computer as the user who will execute the test. The test controller machine and the Windows 7 desktop computer are in the same domain.
You need to enable the TFS Agent to execute the application on the Windows 7 desktop computer.
Which two actions should you perform? Each correct answer presents part of the solution.

正確答案: A,C
說明:(僅 Fast2test 成員可見)
You manage a software development project that includes multiple feature teams. The teams integrate their code into a shared code repository as frequently as possible.
You plan to configure a build definition by using the default build process template (DefaultTemplate.xaml).
You need to know when a check-in from a feature team has broken the build or caused a test to fail, without impacting the feature team.
What should you do?

正確答案: C
You plan to conduct a manual test for an ASP.NET website by using Microsoft Test Manager (MTM). You create a test plan named Calculate_Margin by using Testing Center in MTM.
You need to link all the test cases that belong to the Calculate_Margin test plan with new requirements that are stored as work items in Team Foundation Server 2012.
What should you do?

正確答案: A
You are using Microsoft Test Manager (MTM).
Your company plans to support SQL Server and third-party databases for the application under test.
You need to test both the SQL Server and third-party databases using one test case to capture test results.
What are two possible ways to achieve this goal? (Each correct answer presents a complete solution. Choose two.)

正確答案: A,C
You manage a development team for a group of stakeholders that are physically remote from your development center. Stakeholders have blocked out dates and times on their schedules for your team.
The stakeholders are concerned that several of the project requirements will not meet their needs due to changing market conditions.
You need to ensure that the following requirements are met: s
Your team is doing effective and efficient work.
The work is meeting the needs of the business.
The project's timeline is not at risk.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
---

正確答案: C,D
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server and Microsoft Lab Management (MLM) 2012.
You need to create a new environment that will support the ability to include a snapshot of the environment in a bug report.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)

正確答案: B,C
You are the product manager for Contoso, Ltd. You are using Microsoft Visual Studio to develop a new product.
Management wants to extend the audience for the new product to include Windows 8 devices. The development team creates an alpha copy of the application for initial testing. A main requirement is to test the application on a device that has never been used for testing.
You need to configure the device for testing after installing the remote debugger.
Which application should you use?

正確答案: C
說明:(僅 Fast2test 成員可見)
You plan to roll out Microsoft Test Manager (MTM). Phase 1 testing will include manual testing only. In Phase 2, you will introduce automated test suites to complement manual testing.
You plan to use diagnostic data adapters for each phase.
You need to provide the correct diagnostic data adapters.
Which data diagnostic adapter is only applicable to manual testing and would accomplish this goal?

正確答案: D
Your development environment includes a team project on TFSPreview. The Team Build definitions include the standard options for staging build output when using the default template.
You need to ensure that the build output is available to anyone with access to the team project. What should you do?

正確答案: C
Your development team uses Scrum as its process framework.
You are attempting to increase efficiency, code quality, and limit scope creep by making
some changes to your team's development process.
You need to identify key metrics for measuring the effect of any changes to your process.
Which three key metrics should you use? Each correct answer presents part of the
solution.

正確答案: A,C,F

聯系我們

如果您有任何問題,請留下您的電子郵件地址,我們將在12小時內回复電子郵件給您。

我們的工作時間:( GMT 0:00-15:00 )
週一至週六

技術支持: 立即聯繫 

English 日本語 Deutsch 한국어