An engineer is performing a layer1 passive wireless site survey utilizing a channel analyzer software in the 2.4 GHz spectrum. Which chart indicates the ratio thatthe interference was present per the duration of the capture?
A)

B)

C)

A)

B)

C)

正確答案: C
A post-deployment active wireless site survey was just completed for a company. Which two pieces of information must be included in the site survey report?(choose two)
正確答案: C,D
Whendesigning a VoWLAN network, what is the recommended cell overlap?
正確答案: C
說明:(僅 Fast2test 成員可見)
An engineer is performing a predictivewireless design for a medical treatment environment, which requires data and voice services. Which of the following is a requirement for the design?
正確答案: A
Which two items do you assess before you add voice to an existing wirelessnetwork? (Choose two.)
正確答案: B,D
Youare designing a wireless network for a small square office. The office can be covered wirelessly by using a couple access points, but the customer requests that the Wi-Fi network be "location-ready". Where do you place the access points based on best practices?
正確答案: D
說明:(僅 Fast2test 成員可見)
An engineer is designing a corporate wireless network that contains areas of sensitive corporate data. Which three devices can create a security breach? (Choose three)
正確答案: A,E,F
Which two Layer 2 securityprotocols are supported by 802.11r under the WLAN configuration? (Choose two.)
正確答案: A,B
You must redesign an existing wireless network the spans multiple floor to supports location based services.
Where do you install the access points?
Where do you install the access points?
正確答案: D
You have been contacted by an existing Cisco wireless networking customer. The BigOil Service Company wants to expand their Wi-Fi network outside their facility to their Pipe and Fittings Yard. The customer is in the oil field services business and provides consumable products to the oil drilling industry. The customer has been using hand-held scanners on their fleet of order-processing vehicles to ensure that the correct parts are collected for each order. The issue that the customer is experiencing is that the processing of customer orders is taking an excessive amount of time.
Each time a new order is received, a paper pull-ticket is physically handed to the operator of an order-processing vehicle. If the specific vehicle cannot pull all the components of a customer order, they must physically hand-off the paper pull-ticket to anotherorder-processing vehicle for completion. After the operator scans the parts to complete the order, they must drive back to the warehouse office to download the order information from the hand-held scanners into the order processing terminals. The current hand-held scanner can process only one order at a time. The company is upgrading to new scanners that operate in the 2.4 GHz spectrum and can process multiple orders simultaneously without any paper forms. The company wants you to validate a design that their internal IT staff has created for the Pipe and Fittings Yard.
(See the enclosed Conceptual Network Diagram and a Proposed AP Placement Diagram of the Big Oil Services Company facility.) The Pipe and Fitting Yard has lights for operation at night. The lights are attached to the side of the Warehouse and Fabrication building and are on 40 foot concrete poles out in the yard and all the lights have 110V power.
The RAP location is on the side of the Warehouse and Fabrication building below the roof line andjust below the exterior light on the side of the building. The RAP will draw power from this light and will have a fiber optic connection back to a switch in the MDF in the office building. All the MAPs will be attached to the light poles in various locations around the Pipe and Fittings Yard.
(See enclosed Proposed AP Placement Diagram.)


The light poles in the Pipe and Fittings Yard are concrete to resist hurricane winds. What problem will the concrete poles pose for mounting the mesh APs?
Each time a new order is received, a paper pull-ticket is physically handed to the operator of an order-processing vehicle. If the specific vehicle cannot pull all the components of a customer order, they must physically hand-off the paper pull-ticket to anotherorder-processing vehicle for completion. After the operator scans the parts to complete the order, they must drive back to the warehouse office to download the order information from the hand-held scanners into the order processing terminals. The current hand-held scanner can process only one order at a time. The company is upgrading to new scanners that operate in the 2.4 GHz spectrum and can process multiple orders simultaneously without any paper forms. The company wants you to validate a design that their internal IT staff has created for the Pipe and Fittings Yard.
(See the enclosed Conceptual Network Diagram and a Proposed AP Placement Diagram of the Big Oil Services Company facility.) The Pipe and Fitting Yard has lights for operation at night. The lights are attached to the side of the Warehouse and Fabrication building and are on 40 foot concrete poles out in the yard and all the lights have 110V power.
The RAP location is on the side of the Warehouse and Fabrication building below the roof line andjust below the exterior light on the side of the building. The RAP will draw power from this light and will have a fiber optic connection back to a switch in the MDF in the office building. All the MAPs will be attached to the light poles in various locations around the Pipe and Fittings Yard.
(See enclosed Proposed AP Placement Diagram.)


The light poles in the Pipe and Fittings Yard are concrete to resist hurricane winds. What problem will the concrete poles pose for mounting the mesh APs?
正確答案: D
An engineer is preparing for an outdoor wireless survey to mesh connecta distant remote building to a connected building. Which two types of antennas are appropriate for this application? (Choose two)
正確答案: A,B
An engineer is preparing for an active site survey of a warehouse and is informed that they should not enter anyareas that are blocked by supplies that are difficult to move. Which option describes how the engineer should address this restriction?
正確答案: B
You must perform a layer 1 survey by using Metageek Chanalyzer on the current operating channel only.
Which operating mode is configured for a cisco cleanAir AP?
Which operating mode is configured for a cisco cleanAir AP?
正確答案: C
A customer is preparing to deploy a wireless network in a stadium andis identifying coverage area requirements for the patrons in suite areas. Which two attributes are relevant to determining these coverage requirements?( choose two)
正確答案: A,C
What is the average IP packet loss needed to support real-time applications over a wireless network?