Refer to the exhibit.

All of the vlans listed in the routing table below are trunked using 802.1q and are active on all switches. PLC1, PLC2, and PLC3 each has IP address 192.168.0.1/24 and are connected to ports configured for vlan 50. L2SW1, L2SW2, and L2SW3 are not using vlan trunking for vlan 50.
L3SW1 has following routing table:
10.0.0.0/8 is variably subnetted, 12 subnets, 2 masks
C 10.3.138.0/23 is directly connected, Vlan307
C 10.3.136.0/23 is directly connected, Vlan306
C 10.15.153.0/24 is directly connected, Vlan398
C 10.3.142.0/23 is directly connected, Vlan309
C 10.3.140.0/23 is directly connected, Vlan308
C 10.3.186.0/23 is directly connected, Vlan293
C 10.15.154.0/24 is directly connected, Vlan399
C 10.3.184.0/23 is directly connected, Vlan292
C 10.3.190.0/23 is directly connected, Vlan295
C 10.3.188.0/23 is directly connected, Vlan294
C 10.3.182.0/23 is directly connected, Vlan291
C 10.3.180.0/23 is directly connected, Vlan290
PLC1, PLC2, and PLC3 cannot be reconfigured. What can be done to be able to simultaneously communicate with PLC1, PLC2, and PLC3?

All of the vlans listed in the routing table below are trunked using 802.1q and are active on all switches. PLC1, PLC2, and PLC3 each has IP address 192.168.0.1/24 and are connected to ports configured for vlan 50. L2SW1, L2SW2, and L2SW3 are not using vlan trunking for vlan 50.
L3SW1 has following routing table:
10.0.0.0/8 is variably subnetted, 12 subnets, 2 masks
C 10.3.138.0/23 is directly connected, Vlan307
C 10.3.136.0/23 is directly connected, Vlan306
C 10.15.153.0/24 is directly connected, Vlan398
C 10.3.142.0/23 is directly connected, Vlan309
C 10.3.140.0/23 is directly connected, Vlan308
C 10.3.186.0/23 is directly connected, Vlan293
C 10.15.154.0/24 is directly connected, Vlan399
C 10.3.184.0/23 is directly connected, Vlan292
C 10.3.190.0/23 is directly connected, Vlan295
C 10.3.188.0/23 is directly connected, Vlan294
C 10.3.182.0/23 is directly connected, Vlan291
C 10.3.180.0/23 is directly connected, Vlan290
PLC1, PLC2, and PLC3 cannot be reconfigured. What can be done to be able to simultaneously communicate with PLC1, PLC2, and PLC3?
正確答案: A
Refer to the exhibit.

Which three options are needed to configure NAT on router GW so PC1 and PC2 will be able to ping 203.0.113.1? (Choose three)

Which three options are needed to configure NAT on router GW so PC1 and PC2 will be able to ping 203.0.113.1? (Choose three)
正確答案: A,B,C
If the Link Fault alarm is connected to the minor relay and the FCS Bit Error Rate alarm is connected to the major relay, which commands will create an alarm profile called GigE with the alarms correctly mapped to the minor and major relays?
正確答案: B
What are the two most relevant factors in determining the class of administration that is required to maintain the telecommunications infrastructure? (Choose two.)
正確答案: B,C
DRAG DROP


正確答案:

Which describes the relationship between a workgroup bridge?
正確答案: C
Which CLI command will display IGMP snooping information in a Cisco IE2000 or Stratix 5700 switch?
正確答案: A
Which is an issue with running CIP Motion on a REP network and identifies an alternate resiliency protocol that works for CIP Motion?
正確答案: A
Which command globally enables QoS on a Cisco Industrial Ethernet switch?
正確答案: A