最新的Oracle Planning Central Cloud 2017 Implementation Essentials - 1z0-992免費考試真題
A customer would like to account for the production loss in the supply planning process using the item shrinkage rate planning specification.
Which statement reflects the system behavior to meet this requirement?
Which statement reflects the system behavior to meet this requirement?
正確答案: A
Your customer has loaded shipment history of 1/1/14 through 12/31/16 and wants to generate a monthly forecast of 1/1/17 through 12/31/17 based on two-year shipment history.
When creating a demand plan, which two plan scopes and demand plan options should your customer use?
(Choose two.)
When creating a demand plan, which two plan scopes and demand plan options should your customer use?
(Choose two.)
正確答案: E,F
說明:(僅 Fast2test 成員可見)
During a client implementation, it is determined that an external forecast will need to be imported into Planning Central for use as a Demand Schedule in a Supply Plan.
What three steps must be executed to enable the successful load of the External Forecast file? (Choose three.)
What three steps must be executed to enable the successful load of the External Forecast file? (Choose three.)
正確答案: A,B,D
During an implementation, customer is in the process of planning supply requirements. Customer also needs to generate forecast and safety stock levels. Which plan type on the plan options should the customer be running?
正確答案: E
How can you deliver a forecast for drop shipments?
正確答案: E
During implementation, the customer would like to use safety stock planning parameters. However, they would like to uncheck "Safety stock change interval to all items." What will the results be if they choose to uncheck this parameter?
正確答案: D
說明:(僅 Fast2test 成員可見)
In which situation would Bills of Distribution be more effective than Sourcing Rules?
正確答案: B
Which three statements are true regarding exceptions? (Choose three.)
正確答案: C,E,F