Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.
正確答案: A,B
A plant runs 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours. The resource is set up with an efficiency of
50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?
50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?
正確答案: B
A manufacturing cloud user wants to print information available in the work order in PDF.
Identify the three reports that the user can print directly from the work order screen using the Print PDF action.
Identify the three reports that the user can print directly from the work order screen using the Print PDF action.
正確答案: A,B,C
You want to use a predefined Standard Operation in a Work Definition, but you also want to change the usage of the Standard Operation resource. Identify the setup required.
正確答案: D
Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an item that will be manufactured in-house.
正確答案: A,B,E
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to- Back order with Make Supply Order, for a nonstocked item.
正確答案: B,E
Identify four parameters that are considered in the calculation of manufacturing lead time in Oracle Manufacturing Cloud.
正確答案: A,B,C,F