Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. You have two teams named Team A and Team B working on a team project.
You assign work items to a team area for each team. Each person belongs to only one team.
You need to provide read-only access to work items in the Team A area node to Team B by using the least number of permissions changes.
What should you do?
You assign work items to a team area for each team. Each person belongs to only one team.
You need to provide read-only access to work items in the Team A area node to Team B by using the least number of permissions changes.
What should you do?
正確答案: C
DRAG DROP
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server.
You need to configure TFS to send an email notification to a group of testers when a build is completed.
What should you do? (To answer, move the three appropriate actions from the list of actions to the answer area and arrange them in the correct order.)

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server.
You need to configure TFS to send an email notification to a group of testers when a build is completed.
What should you do? (To answer, move the three appropriate actions from the list of actions to the answer area and arrange them in the correct order.)

正確答案:

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Your developers use Visual Studio 2012.
Developers frequently work from locations where there is no network connection.
You need to ensure that developers are able to easily compare their current changes to the last version retrieved from version control.
Which type of workspace should you configure?
Developers frequently work from locations where there is no network connection.
You need to ensure that developers are able to easily compare their current changes to the last version retrieved from version control.
Which type of workspace should you configure?
正確答案: D
Your network environment is configured according to the following table:

TFS2 experiences complete hardware failure.
You need to replace TFS2.
You install TFS on a new server. In which mode should you configure TFS?

TFS2 experiences complete hardware failure.
You need to replace TFS2.
You install TFS on a new server. In which mode should you configure TFS?
正確答案: D
You have an existing deployment of Microsoft Visual Studio Team Foundation Server (TFS). The application tier and data tier are on separate dedicated servers.
You need to provide redundancy to the application tier and increase performance.
Which two actions should you perform? Each correct answer presents part of the solution.
You need to provide redundancy to the application tier and increase performance.
Which two actions should you perform? Each correct answer presents part of the solution.
正確答案: A,C
說明:(僅 Fast2test 成員可見)
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server and Microsoft Lab Management (MLM) 2012.
You want to create a clone of the development test environment in your domain that will support testing patches of your software while continuing to support release testing in the existing environment.
You need to configure the environment to support network isolation.
Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)
You want to create a clone of the development test environment in your domain that will support testing patches of your software while continuing to support release testing in the existing environment.
You need to configure the environment to support network isolation.
Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)
正確答案: B,D,F
DRAG DROP
Your network environment is configured according to the following table:

You do not have budget to install a new machine.
You need to perform an in-place upgrade of your TFS1 server from TFS 2012.
What should you do? (To answer, move six appropriate actions from list of actions to the
answer are and arrange them in the correct order)

Your network environment is configured according to the following table:

You do not have budget to install a new machine.
You need to perform an in-place upgrade of your TFS1 server from TFS 2012.
What should you do? (To answer, move six appropriate actions from list of actions to the
answer are and arrange them in the correct order)

正確答案:

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server with Microsoft SQL Server 2012 Reporting Services (SSRS) and Analysis Services (SSAS).
Users report that the data in their reports is out of date.
You need to view the status of the data warehouse. You also need to view the analysis database jobs and see when each last ran successfully.
What should you do?
Users report that the data in their reports is out of date.
You need to view the status of the data warehouse. You also need to view the analysis database jobs and see when each last ran successfully.
What should you do?
正確答案: B
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. All of your Team Projects use the default Scrum process template.
You create a new work item type named AcceptanceBug.
You need to ensure that work items of this type are displayed in queries for bugs.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
You create a new work item type named AcceptanceBug.
You need to ensure that work items of this type are displayed in queries for bugs.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
正確答案: B,E
Your network environment includes a Microsoft Visual Studio Team Foundation Server 2012 (TFS) server. A single build machine is installed with one controller and two agents. The working directories are configured to use the following working directory:
$(SystemDrive)\Builds\$(BuildAgentId)\$(BuildDefinitionPath).
Your system drive is running out of space and some builds often fail with the following error:
"The specified path, file name, or both are too long. The fully qualified file name must be less than 260 characters, and the directory name must be less than 248 characters."
You need to meet the following requirements:
- Point the working path to drive D.
- Construct a working directory that can be used to define the shortest unique path for each build agent it is used on.
What should you do?
$(SystemDrive)\Builds\$(BuildAgentId)\$(BuildDefinitionPath).
Your system drive is running out of space and some builds often fail with the following error:
"The specified path, file name, or both are too long. The fully qualified file name must be less than 260 characters, and the directory name must be less than 248 characters."
You need to meet the following requirements:
- Point the working path to drive D.
- Construct a working directory that can be used to define the shortest unique path for each build agent it is used on.
What should you do?
正確答案: A