最新的IBM Power Systems with POWER7 Common Technical Sales Skills - v1 - 000-106免費考試真題

A medical services customer has multiple partitioned Power 720 and 740 systems managed by an HMC. The development manager
has requested access to the system console of the development partitions to enable PTF and system save management.
What is the most appropriate response to this request?

正確答案: A
A customer with multiple AIX partitions on a Power 750 has made application changes that have increased the memory required by that partition. The processors are only 18% utilized but the installed memory is fully committed. The customer has little available budget, but requires a cost effective solution while they resolve the application issue.
What would be the most cost effective option?

正確答案: B
A customer changed processor and memory resources to an LPAR dynamically using DLPAR, but the changes are not retained
after the partition is shut down and reactivated.
What will resolve this situation?

正確答案: C
A customer wants to monitor energy consumption for all of their IBM systems. What part of the IBM Systems Director family supports this function?

正確答案: D
Where is specific information regarding height, width, depth, and weight of a Power Systems server located?

正確答案: B
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?

正確答案: A

聯系我們

如果您有任何問題,請留下您的電子郵件地址,我們將在12小時內回复電子郵件給您。

我們的工作時間:( GMT 0:00-15:00 )
週一至週六

技術支持: 立即聯繫 

English 日本語 Deutsch 한국어