最新的IBM Tivoli Storage Manager V6.2 Implementation - 000-037免費考試真題
A company is experiencing a problem where all but one client node can connect to the server. What is the problem and how can it be corrected?
正確答案: A
A storage pool is running out of tape volumes. The pool contains many tapes with a status of full and which have a low percent utilization. What can be done to free up tape volumes?
正確答案: A
What are the two exceptions when an incremental backup is taken with the snapdiff option against a CIFS mounted fileshare, located on an IBM N-Series filer? (Choose two.)
正確答案: B,E
How can it be verified that the backup schedule job ran successfully and backed up all expected files?
正確答案: C
How can a system administrator improve the data transfer rate during a deduplication process?
正確答案: A
For further automation, an administrator uses their own IBM Tivoli Storage Manager V6.2 maintenance script. The script is created on the TIP/Admin Center. What is the correct sequence of steps to create this maintenance script?
正確答案: B
If there is an error created by reading or writing data from a device attached to an AIX system, what should be checked for information?
正確答案: A
What are three ways to define client options in IBM Tivoli Storage Manager V6.2 (TSM)? (Choose three.)
正確答案: C,D,F
Which application verifies a successful installation of IBM Tivoli Storage Manager for Reporting and Monitoring on Linux and AIX?
正確答案: D
A company with a large number of clients frequently runs out of available tape drives during storage pool backups. How can they reduce the number of mount points used?
正確答案: C