最新的USGBC LEED AP Building Design + Construction (LEED AP BD+C) - LEED-AP-BD-C免費考試真題
When designing a building that includes Electric Vehicle Supply Equipment (EVSE), which capability is needed to ensure maximum energy efficiency and cost savings?
正確答案: C
說明:(僅 Fast2test 成員可見)
Which of the following goals does selecting low-emitting materials serve in the context of MRc3: Low-Emitting Materials?
正確答案: C
說明:(僅 Fast2test 成員可見)
What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?
正確答案: A
說明:(僅 Fast2test 成員可見)
Building Product Disclosure and Optimization is based on market
正確答案: A
說明:(僅 Fast2test 成員可見)
In the energy modeling of a building envelope, which of the following U-values should be considered as an assembly U-value?
正確答案: A
說明:(僅 Fast2test 成員可見)
To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate
正確答案: B
說明:(僅 Fast2test 成員可見)
A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of
正確答案: C
說明:(僅 Fast2test 成員可見)
Which of the following actions should be taken to ensure that project team members understand and prioritize the selection of materials compliant with the Materials and Resources Credit: Building Product Disclosure and Optimization?
正確答案: D
說明:(僅 Fast2test 成員可見)
The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following materials on the documentation contribute towards the credit?
正確答案: B
說明:(僅 Fast2test 成員可見)
A project team seeking certification for a new school is attempting to achieve Materials and Resources Credit, Construction and Demolition Waste Management, Option 2. Reduction of Total Waste Material. What strategy can be taken to meet the requirements of this credit?
正確答案: B
說明:(僅 Fast2test 成員可見)
A project's total site area is 240,000 ft2 (22 297 m2) and the building footprint is 40,000 ft2 (3 716 m2). How much outdoor space and vegetated space must it provide to earn Sustainable Sites Credit, Open Space?
正確答案: A
說明:(僅 Fast2test 成員可見)
A building owner is considering the installation of a solar thermal panel on the roof of the building. The initial cost of the system is higher than a conventional natural gas system. Which of the following is true to make the renewable energy option economically feasible?
正確答案: D
說明:(僅 Fast2test 成員可見)
During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?
正確答案: A
說明:(僅 Fast2test 成員可見)
Which of the following strategies can be used to decrease the envelope load of a building?
正確答案: C
說明:(僅 Fast2test 成員可見)