最新的SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 - C_TSCM42_67免費考試真題
Which of the following properties applies to multi-site planning in SAP ECC?
正確答案: B
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
正確答案: A,D
Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three)
正確答案: A,B,D
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?
正確答案: B
Which of the following situations occur when a production order is set to Technically Complete (TECO)?
(Choose three.)
(Choose three.)
正確答案: A,C,E
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default.
However, some materials need to have a different planning horizon.
Which procedure do you recommend for setting the planning horizon?
However, some materials need to have a different planning horizon.
Which procedure do you recommend for setting the planning horizon?
正確答案: B
In which of the following objects can you activate back flushing for production orders? (Choose three)
正確答案: A,B,C
Which objects can affect the calculation of capacity requirements for an operation? (Choose three)
正確答案: A,B,D
The company you advise wants to carry out the material availability check automatically in the production order at various points in time. Which of the following options would you recommend? (Choose two.)
正確答案: B,D
Which of the following scheduling types can only be used in capacity planning?
正確答案: A