When if the BEST time for automation to consider legal and/or standard requirements for a SUT?

正確答案: B
說明:(僅 Fast2test 成員可見)
What is NOT a factor in considering when you are asked to ensure an effective transition from manual to automated tests?

正確答案: A
說明:(僅 Fast2test 成員可見)
You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11th test. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.
What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11th test?

正確答案: D
說明:(僅 Fast2test 成員可見)
Which of the following statements about the reuse of TAS artefacts is TRUE?

正確答案: C
說明:(僅 Fast2test 成員可見)
You are currently designing the TAA of a TAS. You have been asked to adopt an approach for automatically generating and executing test cases from a model that defines the SUT. The SUT is a state-based and event-driven that is described by a finite-state machine and exposes its functionality via an API. The behavior of the SUT depends on hardware and communication links that can be unreliable.
Which of the following aspects is MOST important when designing the TAA in this scenario?

正確答案: A
說明:(僅 Fast2test 成員可見)
A defect in a SUT has been resolved and validated by an automated defect re-test in the current release of the software. This retest has now been added to the automated regression test suite.
Which statement BEST describes a reason why this defect could re-occur in future releases?

正確答案: D
說明:(僅 Fast2test 成員可見)
You have been asked to automate a set of functional tests at system Test level via the CLI of the SUT for the first release of a software system. The automated tests will be delivered to the learn in change of maintenance testing, who will use them for part of the regression testing. They have the following requirements.
1. The automated tests must be as fast and cheap to maintain as possible
2. The cost of adding new automated tests must be as low as possible
3. The automated tests must have a high level of independence from the tool itself Which of the following scripting techniques would be MOST suitable?

正確答案: D
說明:(僅 Fast2test 成員可見)
You have been asked to develop test automation for a legacy system that is going to go through a series of infrastructure migrations. The scripts will be used to verify basic functionality during these infrastructure changes Your Test Analysts have some programming skills and need a solution that is simple and fast.
Maintainability of the scripts is not a consideration because no changes to the software are anticipated.
Which of the following is the BEST scripting approach in this situation?

正確答案: B
說明:(僅 Fast2test 成員可見)
Consider the following example of TAS metrics.
Time to execute automated tests
Speed and efficiency of TAS components
Which of the following statements is TRUE?

正確答案: D
說明:(僅 Fast2test 成員可見)