最新的IBM Maximo Asset Management v7.6 Functional Analyst - C2010-555免費考試真題
Which application must be used to create services that can be selected from a value list on a purchase order?
正確答案: C
An asset has an associated meter, RUNHOURS, and the Reading Type is set to ACTUAL. The asset will require maintenance every 500 hours of operation.
What must the PM configuration include?
What must the PM configuration include?
正確答案: D
What can be performed in the Assignments tab of Work Order Tracking?
正確答案: C
A company has a requirement to report on actual labor hours, materials, services and tools used as work progresses on a work order.
What is the earliest point in the basic life cycle a user can start reporting?
What is the earliest point in the basic life cycle a user can start reporting?
正確答案: C
An approved work order has been assigned an incorrect job plan.
How do you correct this?
How do you correct this?
正確答案: D
A user belongs to two non-independent security groups, Group A and Group B.
Group A has a purchasing limit of $7000 and Group B has a purchasing limit of $8000.
What is the purchasing limit of a user who belongs to both security groups?
Group A has a purchasing limit of $7000 and Group B has a purchasing limit of $8000.
What is the purchasing limit of a user who belongs to both security groups?
正確答案: B
Which of the following settings values will determine the number of items to be ordered during the reorder process?
正確答案: C
Incorrect meter readings have been taken for gauge meters and characteristic meters. The system administrator has been asked to correct the mistake.
How can the meter readings be corrected?
How can the meter readings be corrected?
正確答案: A